Question
Building Construction and Structural systems Question on Building Performance Simulation and Evaluation
The following Figure shows the excavation plan of a two room structure, where the trench has a uniform width of 1.10 meters. If the cumulative centre line length of the trench is 41.10 meters and the required depth of concrete to be poured is 0.30 meters, the volume of concrete in foundation, in cubic meters, will be _______(rounded off to two decimal places).
Answer
The correct answer is : 13.2