Match the items in Group-I with their corresponding items in Group–IIGroup IGroup II
(P) Floating floor(1) Overflow control
(Q) Float valve(2) Delay not affecting a project
(R) Metal float(3) Acoustical buffer
(S) Free float(4) Plastering equipment
(5) Traffic flow control
A

P-3, Q-2, R - 4, S - 1

B

P-5, Q-1, R-3, S-4

C

P-3, Q-1, R-4, S − 2

D

P-1, Q-2, R-5, S - 4

Answer

P-3, Q-1, R-4, S − 2

Explanation

Solution

The correct answer is (C): P to 3, Q to 1, R to 4, S − 2