Machine A produces 90 toys in 15 minutes and machine B produces 60 toys in 30 minutes. If both the machines run simultaneously, then how many minutes will be required to produce 400 toys?
A
35
B
40
C
45
D
50
Answer
50
Explanation
Solution
The correct answer is (D): 50