Question
Quantitative Aptitude Question on Time and Work
An overhead water tank of 7200 m3 capacity is being filled with water. The delivery of the pump filling the tank is 5/6th of the delivery of the pump discharging the same tank. As a result, 24 minutes more is needed to fill the tank than discharge it. Determine the delivery of the pump in filling the tank.
A
90 m3/min
B
72 m3/min
C
60 m3/min
D
50 m3/min
Answer
50 m3/min
Explanation
Solution
Let the delivery of the pump filling the tank = X m3/min
⇒ delivery of the pump discharging the tank = 56X m3/min
⇒ X7200−56X7200=24
⇒ X1200=24
⇒ X=50.
So, the correct option is (D): 50 m3/min