A and B can separately do a piece of work in 20 and 15 days, respectively. They worked together for 6 days, after which B was replaced by C. If the work was finished in the next 4 days, then the number of days in which C alone could do the work will be
60 days
40 days
35 days
30 days
40 days
Solution
Work done by A in one day =201 and work done by B in one day =151
Work done by both A and B in one day =201+151=607
Work done by A and B in 6 days =607 × 6 =107
Remaining Work =1−107=103
Now, Time taken by A and B to complete the work in next 4 days is given by
⇒ (Remaining work / (A + C)'s effeciency) = Remaining time to complete the work.
⇒ 201+C1=4days
⇒ 103=4(201+C1)
⇒ 103=204+C4 ⇒ C4=103−51
⇒ C1=401 (or) C = 40 days
Hence, option B is the correct answer.The correct option is (B): 40 days